USS Uhlmann (DD-687) was a Fletcher-class destroyer commissioned 22 June 1944 — Pacific Theater WWII combat operations (Marianas, Philippines, Okinawa, Iwo Jima), Korean War, and Cold War service through 1972.

The 64-entry equipment manifest below is sourced from ship-specific BUSHIPS (Bureau of Ships) documentation identifying machinery and equipment installed aboard. Each entry is documented equipment with verified manufacturer attribution — primary-source material for asbestos-exposure case development by Navy veterans and surviving families.

Equipment Manifest

Equipment Manifest — USS Uhlmann (DD-687). 64 machinery/equipment entries identified through ship-specific BUSHIPS documentation. Manufacturers in bold link to documented asbestos-product history on AsbestosIndex.com.
EquipmentManufacturerQtyNotes
Main Reduction GearDeLaval1Port
Turning Gear Motor ControlDeLaval2
Lower Gear CaseDeLavalOil pain, thrust bearing assembly, low speed rotor
Upper Gear CaseDeLavalWith bearings, caps, extension shaft, 16 pieces oil piping
Main TurbineGeneral Electric
Reduction GearsDeLaval Steam Turbine Co.Type: Main-Double Red, Cruising Single Red
BoilerBabcock & Wilcox
Main Condenser Circ. PumpWarren; Westinghouse2One in each engine room
Main Feed PumpBuffalo Pump Co.; Terry4Two in each engine room
Main Condensate PumpBuffalo; Philadelphia; Terry; General Electric4One in each engine room
Main Feed Booster PumpBuffalo; Philadelphia; Terry; General Electric4One in each engine room
Fuel Oil Service Pump - MainDeLaval12Two in each fire room
Fuel Oil Booster PumpDeLaval6One in each fire room
Diesel Oil Service PumpGeneral Electric1Aft Engine Room
Fire and Bilge PumpsWarren8One in each fire room and one in each engine room
Emergency Feed PumpWarren4One in each fire room
Fire & Flushing PumpBuffalo/Westinghouse2One in Fwd Engine room; One in Aft Engine room
Fresh Water PumpWarren/General Electric2Fwd. Engine Room
Distilling Condenser Circ. PumpBuffalo/Westinghouse1Fwd Engine Room
Distilling Cond. Condie PumpBuffalo/Westinghouse1Fwd Engine Room
Evap. Brine Overboard PumpBuffalo/Westinghouse1
Dist. Cond. F.W. Dist. PumpBuffalo/Westinghouse1Fwd Engine Room
1st Effect. Evrp. Tube Next Dr. PumpBuffalo/Westinghouse1Fwd Engine Room
Flux Condenser Circ. PumpBuffalo/Westinghouse2One in each engine room
Aux. Condensate PumpBuffalo/General Electric2One in each engine room
Aux. Feed Booster PumpBuffalo/Gen. Electric2One in each engine room
Gland Leakoff ExhausterSturtevant/Diehl2One in each engine room
H.P. Air CompressorWorthington/Sturtevant1Aft Fire Room
L.P. Air CompressorWorthington/Gen. Ele.1Aft Engine Room
Forced Draft BlowersWestinghouse16Four in each fire room
S.W. Circ. Pump For Emer. Diesel Gen.Warren/Electro-dynamic1Ice machinery room
Diesel Oil Purifier PumpDeLaval/Separator co./Gen. Ele.1Aft. Engine room
Lub Oil Purifier PumpDeLaval/Separator Co./Gen. Ele.1One in each engine room
CondenserWorthington2One in each room
Air EjectorWorthington2Per ship
Miscellaneous Heat ExchangerGriscom-Russell8Four in each Fireroom
Refrigerating PlantsCarrier Corp.2One in each Fireroom
Evap. And Distilling PlantsGriscom Russell Co.
Turbine Generator SetGeneral Electric8290 KW
Emerg. Diesel Gen. SetGeneral Electric1100 KW
Motor GeneratorR.C.A. Mfg. Co.6
MotorDiehl Manu co.2
MotorHoltzer Cabot2
Motor GeneratorSperry Gyro Co.8Gyro compass
Motor GeneratorElectric Speciality Co.2Shaft Rev. Ind. - Rotary Converter
Turbo-generatorGeneral Ele. Co.1
Machinery AllowancesAmerican Blower Corp.Motor spares
Turbine GeneratorGen. Electric Co.
Buffalo PumpBuffalo Pump1Main feed pump
Turbine Main Red Gear Casing No. 1Warren Steam Pump Co.Engine room
Fresh Water PumpFoster Engineering Co1To arrive 06/20
Aux Cond. PumpBuffalo Pump Co1Handwritten note - Buffalo could not ship til any - DeLaval
Expedite valvesCrane CoDelivery in 8 weeks
Gate valvesCrane Co83/4 inch
Auxiliary Cond. PumpDeLaval Turbine Co2Available pumps with outline plans furnished
Main feed pumpsFoster2
Fresh water pumpWarren Steam Pump Co1
Brine overboard discharge pumpBuffalo Pumps1
Distiller circ. pumpBuffalo Pumps1
Oil Booster Pump worms and wheelsDeLaval
Starter for auxiliary condenser circ. pumpWestinghouse1
Aux. Cond Condensate PumpDeLaval Steam Turbine
GeneratorGE Co1Reconditioning
Turbo GeneratorGen Ele1290 KW

Asbestos-Containing Materials Aboard Uhlmann

The standard asbestos-containing materials installed throughout U.S. Navy destroyers of this era are documented to have included:

  • Pipe lagging and thermal insulation on main steam, feed-water, fuel-oil, condensate, and saltwater piping throughout machinery spaces
  • Boiler block insulation, refractory brick, and gun-blocks around the main boilers
  • Asbestos gaskets and braided packing in valves, flanges, pumps, condensers, heat exchangers, and turbine glands
  • Insulation jackets and removable lagging on main propulsion turbines, reduction gears, ship-service turbine generators, and forced-draft blowers
  • Sheet asbestos and Marinite panels as fire-stops, bulkhead insulation, and overhead insulation
  • Vinyl asbestos floor tile (VAT) in passageways, berthing, mess decks, and habitable compartments
  • Asbestos rope, wick, and tape in gland-seal applications throughout the engineering plant

Sailors in Boilerman, Machinist’s Mate, Engineman, Electrician’s Mate, Hull Maintenance Technician, Damage Controlman, and other engineering ratings worked routinely in spaces where these materials were installed, maintained, ripped out, and replaced.

VA Benefits for Uhlmann Veterans

The Department of Veterans Affairs recognizes mesothelioma, asbestos-related lung cancer, asbestosis, and pleural disease as conditions presumed to be service-connected for Navy veterans with documented asbestos exposure. The Uhlmann equipment manifest is direct documentary evidence of the asbestos-containing materials her crew worked around throughout her service life.

Parallel claims against the asbestos bankruptcy trust funds established by the manufacturers of these products are also available, and do not reduce VA compensation.

Speak with an asbestos attorney with Navy veterans experience →


Equipment manifest derived from public-record BUSHIPS documentation specific to USS Uhlmann (DD-687). Manufacturer attribution links to documented asbestos-product histories on AsbestosIndex.com where available. Editorial review applied per site standards.