USS McCard (DD-822) was a Gearing-class destroyer commissioned 26 October 1946 and serving the U.S. Navy through 1980 — Cold War Atlantic Fleet, Korean War, and Vietnam-era anti-submarine warfare operations.
The 9-entry equipment manifest below is sourced from ship-specific BUSHIPS (Bureau of Ships) documentation identifying machinery and equipment installed aboard. Each entry is documented equipment with verified manufacturer attribution — primary-source material for asbestos-exposure case development by Navy veterans and surviving families.
Equipment Manifest
| Equipment | Manufacturer | Qty | Notes |
|---|---|---|---|
| HIGH PRESSURE TURBINE | Westinghouse Elec. | ||
| CRUISING TURBINE | Westinghouse Elec. | ||
| LOW PRESSURE TURBINE | Westinghouse Elec. | ||
| Sonar Model Equipment AN/SQS-4 | Unknown | 1 | Mod. 2 dome size 185 inches |
| H.P. Turbine #2 | Westinghouse Electric and Mfg. Co. | 1 | Type Single Flo Impulse, Serial #2-A-9856-24 |
| L.P. Turbines #1 and #2 | Westinghouse | 2 | Cruising Turbines |
| Main Feed Pumps #2 and #3 | Worthington Pump and Machinery Corp. | Mfgr. | |
| Emergency Feed Pump #1 | Warren Steam Pump Co. | Mfgr. | |
| Boilers | Babcock and Wilcox | 4 | Divided Furnace, Single Uptake, DD692 Class. Renewal of furnace refractories |
| Boilers #1, 2, 3 and 4 | Babcock and Wilcox | 4 | Divided Furnace, Single Uptake, DD692 Class |
Asbestos-Containing Materials Aboard McCard
The standard asbestos-containing materials installed throughout U.S. Navy destroyers of this era are documented to have included:
- Pipe lagging and thermal insulation on main steam, feed-water, fuel-oil, condensate, and saltwater piping throughout machinery spaces
- Boiler block insulation, refractory brick, and gun-blocks around the main boilers
- Asbestos gaskets and braided packing in valves, flanges, pumps, condensers, heat exchangers, and turbine glands
- Insulation jackets and removable lagging on main propulsion turbines, reduction gears, ship-service turbine generators, and forced-draft blowers
- Sheet asbestos and Marinite panels as fire-stops, bulkhead insulation, and overhead insulation
- Vinyl asbestos floor tile (VAT) in passageways, berthing, mess decks, and habitable compartments
- Asbestos rope, wick, and tape in gland-seal applications throughout the engineering plant
Sailors in Boilerman, Machinist’s Mate, Engineman, Electrician’s Mate, Hull Maintenance Technician, Damage Controlman, and other engineering ratings worked routinely in spaces where these materials were installed, maintained, ripped out, and replaced.
VA Benefits for McCard Veterans
The Department of Veterans Affairs recognizes mesothelioma, asbestos-related lung cancer, asbestosis, and pleural disease as conditions presumed to be service-connected for Navy veterans with documented asbestos exposure. The McCard equipment manifest is direct documentary evidence of the asbestos-containing materials her crew worked around throughout her service life.
Parallel claims against the asbestos bankruptcy trust funds established by the manufacturers of these products are also available, and do not reduce VA compensation.
Speak with an asbestos attorney with Navy veterans experience →
Equipment manifest derived from public-record BUSHIPS documentation specific to USS McCard (DD-822). Manufacturer attribution links to documented asbestos-product histories on AsbestosIndex.com where available. Editorial review applied per site standards.