USS John King (DDG-3) was a Charles F. Adams-class guided-missile destroyer commissioned 4 February 1961 and serving the U.S. Navy through 30 March 1990 — Cuban Missile Crisis quarantine, Cold War Atlantic Fleet operations, and Operation Desert Shield.

The 42-entry equipment manifest below is sourced from ship-specific BUSHIPS (Bureau of Ships) documentation identifying machinery and equipment installed aboard. Each entry is documented equipment with verified manufacturer attribution — primary-source material for asbestos-exposure case development by Navy veterans and surviving families.

Equipment Manifest

Equipment Manifest — USS John King (DDG-3). 43 machinery/equipment entries identified through ship-specific BUSHIPS documentation. Manufacturers in bold link to documented asbestos-product history on AsbestosIndex.com.
EquipmentManufacturerQtyNotes
Generators, Turbine 500 KWGeneral Electric Co.1Spec No. 5-23-57
Exciter 120 V Erg GasHercules Motor Co.1Spec No. 5-27-57
Motor Generator Sets, 60 KW 400 CycleWestinghouse Electric Corp.3Spec No. 10-4-57
Motor Generator Sets, 100 KW CycleContinental Electric Co., Inc.1Spec No. 4-24-59
Motor Control Equipment for Various ApplicationsReliance Electric & Engineering Co.1
Starting Switch Service & Oil CircuitTolcar Company1Spec No. 6-7-57
High Temperature Alarm Magnaing Spring AlarmL-Ang Corporation1Spec No. 6-7-57
High Temperature AlarmSmithbond, Peak & Lorash Co.1
High OooMetropolitan Electric1Spec No. 4-25-57
Onboard Soda Powered TelephoneControl Instrumentation Co., Inc.2Spec No. 4-25-57
Sound Powered Telephone Headsets & HandsetsTelephonique Corp.4Spec No. 5-10-57
Dial Telephone Equipment Panels, Distribution Center & LightingAutomatic Electric Sallis Corp.6Spec No. 7-3-57
I-T-E Circuit Breaker CompanyI-T-E Circuit Breaker Company28Spec No. 6-11-57
Panel, Temperature Indicator for 500 WTI-T-E Circuit Breaker Company3Spec No. 6-11-57
Panels, I.C. Distribution (Special)Rits-Holden & Galvan Industries, Inc.2Spec No. 12-3-57
Panel, Combustion CO2 & Smoke Detecting Alarm PanelPyrotronics Division2Spec No. 6-27-57
Panel, Disable Guidance Radar I-T-E Circuit BreakerFoster Transfer Company1Spec No. 4-27-57
Trimmering Control PanelEts-Irokin & Galvan Electro-Kinetic, Inc.1Spec No. 4-27-57
Lather Winder Elec. (Comml.) Separate Transistor UnitLather Winder Elec. (Comml.)1Spec No. 1-12-59
TransmitterJohn Oster Jr. Div. Rojo, Inc.1Spec No. 1-12-59
TransmitterThos. A. Edison Industries3Spec No. 6-4-57
TransmitterMcGraw-Edison Div.2Spec No. 11-5-59
Smoke GeneratorGeneral Electric Co.1Spec No. 4-24-57
Smoke Generator Electro-Matic Power Plant Double Punch Co. C/o Hm Tech.Prod.Inc.Electro-Matic Power Plant Double Punch Co.1Spec No. 2-15-59
Automatic Bus TransfersAutomatic Switch Co.1Spec No. 2-8-57
Hand Bus Transfers I-T-E Circuit Breaker CompanyI-T-E Circuit Breaker Company1Spec No. 5-31-57
Synchro Signal AmplifiersPathrodic Protection System PS-T-E Spec.1Spec No. 1-3-57
Cathodic Protection System EquipmentClague Engineering Div.1Spec No. 4-17-57
Announcing System Equipment (Microphones & Loudspeakers)Remler Company1Spec No. 5-10-57
Salinity Indicating Sp. Equipment (Panels & Pens & Valve Call Assembly)Garraith-Pilot Marine & Valve Div. of Marine Electric Corpo1Spec No. 5-2-57
SP Control Order tr. Indicator EquipmentGeneral Electric Co.1Spec No. 3-10-57
Audible Signals (Bells, Buzzers, Horns & Sirens)General Electric1Spec No. 4-24-57
Opaque Plastic ChartsMinnesota Mining & Manufacturing Co.3Spec No. 6-2-60
Fans, VentJ.P. Manufacturing Co.2Spec No. 3-6-58
Fans, VentWing Drug Co.1Spec No. 3-6-58
Plotting & Status BoardsW.H. Rietstiner Mfg. Co.6Spec No. 5-7-57
Boat Davit & VehicleWelin Davit & Boat Devo1Spec No. 6-7-57
Electro-Hydraulic Steering Gear & WindlassContinental Copper & Steel Windlass Company1Spec No. 6-13-57
Electro-Boat Anchor WindlassHyde Hydraulics Company1Spec No. 6-13-57
Electric Ship Hoisting Winch Type & Limit SwitchesYale & Towne Co.1Spec No. 7-10-57
Navy Trawler Equipment CompanyNavy Trawler Equipment Company2Spec No. 5-1-57
Double Reeving WinchRide Windlass Company8Spec No. 6-13-57
Electric Tarpaulin CapstanRide Windlass Company7Spec No. 6-13-57

Asbestos-Containing Materials Aboard John King

The standard asbestos-containing materials installed throughout U.S. Navy destroyers of this era are documented to have included:

  • Pipe lagging and thermal insulation on main steam, feed-water, fuel-oil, condensate, and saltwater piping throughout machinery spaces
  • Boiler block insulation, refractory brick, and gun-blocks around the main boilers
  • Asbestos gaskets and braided packing in valves, flanges, pumps, condensers, heat exchangers, and turbine glands
  • Insulation jackets and removable lagging on main propulsion turbines, reduction gears, ship-service turbine generators, and forced-draft blowers
  • Sheet asbestos and Marinite panels as fire-stops, bulkhead insulation, and overhead insulation
  • Vinyl asbestos floor tile (VAT) in passageways, berthing, mess decks, and habitable compartments
  • Asbestos rope, wick, and tape in gland-seal applications throughout the engineering plant

Sailors in Boilerman, Machinist’s Mate, Engineman, Electrician’s Mate, Hull Maintenance Technician, Damage Controlman, and other engineering ratings worked routinely in spaces where these materials were installed, maintained, ripped out, and replaced.

VA Benefits for John King Veterans

The Department of Veterans Affairs recognizes mesothelioma, asbestos-related lung cancer, asbestosis, and pleural disease as conditions presumed to be service-connected for Navy veterans with documented asbestos exposure. The John King equipment manifest is direct documentary evidence of the asbestos-containing materials her crew worked around throughout her service life.

Parallel claims against the asbestos bankruptcy trust funds established by the manufacturers of these products are also available, and do not reduce VA compensation.

Speak with an asbestos attorney with Navy veterans experience →


Equipment manifest derived from public-record BUSHIPS documentation specific to USS John King (DDG-3). Manufacturer attribution links to documented asbestos-product histories on AsbestosIndex.com where available. Editorial review applied per site standards.