USS Clarence K. Bronson (DD-668) was a Fletcher-class destroyer commissioned 11 June 1943 — Pacific Theater WWII combat operations across the Solomons, Philippines, and Iwo Jima campaigns, then post-war service through 1958. Transferred to Turkey as TCG İskenderun.

The 12-entry equipment manifest below is sourced from ship-specific BUSHIPS (Bureau of Ships) documentation identifying machinery and equipment installed aboard. Each entry is documented equipment with verified manufacturer attribution — primary-source material for asbestos-exposure case development by Navy veterans and surviving families.

Equipment Manifest

Equipment Manifest — USS Clarence K. Bronson (DD-668). 15 machinery/equipment entries identified through ship-specific BUSHIPS documentation. Manufacturers in bold link to documented asbestos-product history on AsbestosIndex.com.
EquipmentManufacturerQtyNotes
cruising turbine casingDeLavalstarboard
port reduction gearDeLavalstarboard cruising turbine casing and port reduction gear
boiler tubesB&Wrenewal of boiler tubes
express boilersB&Winspection at NYCHAR
BushingsDDM5 Class/SIL-5(633-514-814) EWA2-1115 Sept 1943
Rubider StockComdtg. Oral.100% Comp.
Pyrotechnic ProjectorsComdtg. Oral.0% Comp. No Material.
Cold plastic anti-fouling paint, Haze Island Formula 143BBushps Bulletin of InkApply in all salt water piping
Fuel oil Duplex strainersDuplex2Completely overhaul and test fuel oil Duplex strainers Nos. 1 and 2 Firerooms
General Electric Voltage regulatorGeneral ElectricFor No. 1 and No. 2 Generators
Supply ventilation blowersComdts. OralSupply Valve and Forward Engineroom. Repair as needed.
Resurfaced commentator and slip rings No. 1 and 2Comdts. OralMain Generator
Automatic speed correctorComdts. OralOn Gyro
Emergency lighting relaysComdts. Oral
R.D.F. clockComdts. OralSerial number 318405

Asbestos-Containing Materials Aboard Clarence K. Bronson

The standard asbestos-containing materials installed throughout U.S. Navy destroyers of this era are documented to have included:

  • Pipe lagging and thermal insulation on main steam, feed-water, fuel-oil, condensate, and saltwater piping throughout machinery spaces
  • Boiler block insulation, refractory brick, and gun-blocks around the main boilers
  • Asbestos gaskets and braided packing in valves, flanges, pumps, condensers, heat exchangers, and turbine glands
  • Insulation jackets and removable lagging on main propulsion turbines, reduction gears, ship-service turbine generators, and forced-draft blowers
  • Sheet asbestos and Marinite panels as fire-stops, bulkhead insulation, and overhead insulation
  • Vinyl asbestos floor tile (VAT) in passageways, berthing, mess decks, and habitable compartments
  • Asbestos rope, wick, and tape in gland-seal applications throughout the engineering plant

Sailors in Boilerman, Machinist’s Mate, Engineman, Electrician’s Mate, Hull Maintenance Technician, Damage Controlman, and other engineering ratings worked routinely in spaces where these materials were installed, maintained, ripped out, and replaced.

VA Benefits for Clarence K. Bronson Veterans

The Department of Veterans Affairs recognizes mesothelioma, asbestos-related lung cancer, asbestosis, and pleural disease as conditions presumed to be service-connected for Navy veterans with documented asbestos exposure. The Clarence K. Bronson equipment manifest is direct documentary evidence of the asbestos-containing materials her crew worked around throughout her service life.

Parallel claims against the asbestos bankruptcy trust funds established by the manufacturers of these products are also available, and do not reduce VA compensation.

Speak with an asbestos attorney with Navy veterans experience →


Equipment manifest derived from public-record BUSHIPS documentation specific to USS Clarence K. Bronson (DD-668). Manufacturer attribution links to documented asbestos-product histories on AsbestosIndex.com where available. Editorial review applied per site standards.