USS Preble (DLG-15) was a Farragut-class guided-missile destroyer-leader (later redesignated guided-missile destroyer, DDG-46) that served the U.S. Navy from her commissioning on 9 May 1960 through decommissioning on 28 September 1991. She was built at Bath Iron Works, Maine, and operated primarily from Pacific Fleet bases over her 31-year service life — a service span squarely within the heaviest asbestos use period in U.S. naval construction.

The equipment manifest below is drawn from BUSHIPS (Bureau of Ships) ship-specific documentation that identifies the machinery and equipment manufacturers installed aboard the Preble. Each entry below is a documented item of equipment with verified manufacturer attribution — primary-source evidence for asbestos-exposure case development.

Equipment Manifest

Equipment Manifest — USS Preble (DLG-15). 36 machinery/equipment entries identified through ship-specific BUSHIPS documentation. Manufacturers in bold link to documented asbestos-product history on AsbestosIndex.com.
EquipmentManufacturerQtyNotes
750 KW Turbine Generator SetGeneral Electric
Main Forced Draft BlowersHardie-Tynes
Main BoilersBabcock & Wilcox
Deaerating Feed TankCochrane Corp.
Propulsion TurbineDeLaval
Main CondensersC.H. Wheeler
Aux. Gland Exhauster CondensersC.H. Wheeler
Distilling PlantBethlehem Steel
Main Feed PumpsGeneral Electric
Main Feed Booster PumpsAllis-Chalmers
Reserve Feed Transfer PumpWell Pumps
Emerg. Diesel S.W. Booster PumpWell Pumps
F.W. Drain PumpWell Pumps
Main Circulating PumpsWarren
Main Condensate PumpsWarren
Mechanical Cooling SW Circ. PumpsAurora
Distiller Feed PumpAurora
Aux. Machy Cooling Water PumpAurora
Aux. Cond. Circ. PumpsAurora
Aux. Condensate PumpsAldrich
Main Fuel Oil Service PumpDeLaval
Port Fuel Oil Service PumpDeLaval
Main Lube Oil Service PumpDeLaval
D.O. Transfer PumpDeLaval
F.O. Transfer PumpDeLaval
Fire PumpsWarren
Fuel Oil Transfer PumpsDeLaval
Oily Bilge & Fuel Oil Tank Stripping PumpWarren
Mechanical Cooling Chilled Water Circ. PumpM.T. Davidson
F.W. Potable PumpsM.T. Davidson
Vacum Priming PumpNash
H.P. Air CompressorWorthington
L.P. Combustion Control CompressorWorthington
Fuel Oil HeatersDavis Engineering
Lube Oil PurifiersSharpies
Diesel Oil PurifiersSharpies

Asbestos Exposure Aboard Preble

The Preble’s engineering plant — Babcock & Wilcox main boilers, DeLaval propulsion turbines, General Electric 750 kW turbine generators, multiple compressors and pump systems — used the standard asbestos-containing materials of her era:

  • Pipe lagging and thermal insulation on steam, feed-water, fuel-oil, and condensate piping throughout machinery spaces
  • Boiler block insulation and refractory around the main boilers
  • Asbestos gaskets and braided packing in valves, flanges, pumps, and turbine glands (Warren Pumps fire pumps documented with original 1959 tech manual)
  • Insulation jackets on turbines, reduction gears, and auxiliary machinery
  • Marinite and sheet asbestos as fire-stops, bulkhead insulation, and overhead insulation
  • Vinyl asbestos floor tile throughout berthing, mess, and habitable compartments

Crew members in Boilerman, Machinist’s Mate, Engineman, Electrician’s Mate, Hull Maintenance Technician, Damage Controlman, and Storekeeper ratings worked routinely in spaces where this equipment was installed, maintained, and overhauled.

VA Benefits for Preble Veterans

The Department of Veterans Affairs recognizes mesothelioma, asbestos-related lung cancer, asbestosis, and pleural disease as conditions presumed to be service-connected for Navy veterans with documented asbestos exposure. Preble’s documented equipment manifest is direct evidence of the asbestos-containing materials her crew worked around.

Speak with an asbestos attorney with Navy veterans experience →


Equipment manifest derived from public-record BUSHIPS documentation specific to USS Preble (DLG-15). Manufacturer attribution links to documented asbestos-product histories on AsbestosIndex.com where available. Editorial review applied per site standards.