USS Mackenzie is a documented U.S. Navy vessel with asbestos-exposure evidence in the public litigation record. The equipment manifest below was assembled from depositions, expert reports, and manufacturer interrogatory responses filed in U.S. asbestos litigation that reference equipment installed aboard this vessel.

Equipment Manifest

Equipment Manifest — USS Mackenzie. 21 machinery/equipment entries identified through ship-specific BUSHIPS documentation. Manufacturers in bold link to documented asbestos-product history on AsbestosIndex.com.
EquipmentManufacturerQtyNotes
ValvesCrane Co.Flange gaskets replaced aboard USS MacKenzie 1963-1965; asbestos-containing gaskets
Main condensate circulating pumpWarren Pumps2One in each engine room aboard USS George K. MacKenzie DD 836
Main condensate circulating pumpWarren2One in each engine room aboard USS George K. MacKenzie DD 836
Fire & bilge pumpWarren4One in each fire and engine room aboard USS George K. MacKenzie DD 836
Fresh Water PumpWarren2One in each engine room aboard USS Mackenzie
BoilersBabcock & Wilcox4Express; superheated single uptake water tube design
EconomizersFoster Wheeler
BlowersWestinghouse Electric Co.4Forced draft
Main Propulsion TurbinesGeneral Electric62 High pressure, 2 Low pressure (also astern turbine), 2 Cruising turbines
Reduction GearDe Laval
Reduction GearWestinghouse
Main CondensersWorthington2
Auxiliary CondensersWorthington2
Main Distilling ApparatusGriscom-Russell112000 gpd
Emergency Distilling ApparatusGriscom-Russell14000 gpd
Ships Service Turbine Drive GeneratorsGeneral Electric
Emergency Diesel GeneratorsGeneral Motor23-368a Drive
Ships Service Air CompressorsWorthingtonHP-LP
Main RefrigerationCarrier Corp.32 main, 1 auxiliary
Fuel Oil HeaterGriscom Russell
Steam, feed water, and fuel oil system valvesCrane Co.Installed in fire and engine rooms aboard USS Mackenzie

Note: this manifest is derived from public asbestos litigation records (depositions, expert reports, manufacturer interrogatories) rather than primary BUSHIPS construction documents. Entries reflect what has been documented or alleged in publicly filed legal records.

Asbestos-Containing Materials Aboard Mackenzie

U.S. Navy vessels built between the 1930s and 1980s were constructed with extensive asbestos-containing materials throughout machinery spaces, engineering plants, and habitability compartments. The standard ACM categories installed and maintained aboard included:

  • Pipe lagging and thermal insulation — main steam, feed-water, fuel-oil, condensate, and saltwater piping throughout machinery spaces.
  • Boiler block insulation, refractory brick, and gun-blocks — around the main boilers and burner fronts.
  • Asbestos gaskets and braided packing — valves, flanges, pumps, condensers, heat exchangers, and turbine glands.
  • Insulation jackets and removable lagging — main propulsion turbines, reduction gears, ship-service turbine generators, and forced-draft blowers.
  • Sheet asbestos and Marinite panels — fire-stops, bulkhead insulation, and overhead insulation throughout damage-control zones.
  • Vinyl asbestos floor tile (VAT) — passageways, berthing, mess decks, wardroom, and habitable compartments.
  • Asbestos rope, wick, and tape — gland-seal applications throughout the engineering plant.

Navy Ratings Most Exposed to Asbestos Aboard Mackenzie

The U.S. Department of Veterans Affairs and the public asbestos litigation record document that the following Navy ratings worked routinely in spaces where ACM was installed, maintained, ripped out, and replaced:

VA Presumptive Benefits — No Filing Deadline

The U.S. Department of Veterans Affairs recognizes mesothelioma, asbestos-related lung cancer, asbestosis, and pleural disease as conditions presumed to be service-connected for Navy veterans with documented asbestos exposure under 38 CFR § 3.309(d). No statute of limitations applies to VA disability compensation claims.

Available benefits may include monthly disability compensation, Dependency & Indemnity Compensation (DIC) for surviving spouses, priority VA healthcare enrollment, and Special Monthly Compensation for severe cases. Parallel claims against the asbestos bankruptcy trust funds established by the manufacturers of these products do not reduce VA compensation.

How to file a VA disability claim: VA claims are filed directly with the U.S. Department of Veterans Affairs — not with a law firm. Start at VA.gov › Hazardous Materials Exposure, call 1‑800‑827‑1000, or get free help filing from a Veterans Service Organization: DAV, VFW, or American Legion.

VA Claims Guide on This Site › Compare: VA vs. Civil Lawsuit

Source notes: equipment-manifest entries (where shown) are sourced from public-record BUSHIPS (Bureau of Ships) documentation, NARA archives, and the public asbestos litigation record. Manufacturer attributions link to documented asbestos-product histories on AsbestosIndex.com where available. Nothing on this page constitutes medical or legal advice.