USS Paul F. Foster (DD-964), third ship of the Spruance class destroyers, was commissioned at Ingalls Shipbuilding in June 1976 and served in the Pacific Fleet throughout her career. Foster operated as an ASW destroyer equipped with ASROC and SH-2 Seasprite helicopter facilities, and later received Tomahawk cruise missile capability through the Vertical Launch System. Foster’s all-gas-turbine propulsion plant — four General Electric LM2500 gas turbines — provided propulsion through her service. Built in 1973–1976, Foster incorporated hull construction materials and gas turbine exhaust system insulation consistent with the mid-1970s transitional construction period.

USS Paul F. Foster Gas Turbine and Construction Asbestos

Foster’s gas turbine propulsion plant and hull construction:

  • Gas turbine exhaust system insulation — the gas turbine exhaust ducting and uptake systems aboard Foster carrying high-temperature exhaust from the LM2500 gas turbines incorporated thermal insulation materials consistent with mid-1970s naval construction specifications. Engineering ratings working in Foster’s engineering spaces accumulated background asbestos exposure from any asbestos-containing exhaust system insulation
  • Gas turbine module enclosures — the acoustic and thermal enclosures surrounding Foster’s LM2500 gas turbine modules incorporated insulation materials consistent with mid-1970s construction specifications
  • Hull construction materials — Foster’s crew berthing, combat systems spaces, and working areas were constructed using the hull construction materials of the 1973–1976 building period representing the peak transitional period in naval construction away from asbestos
  • Tomahawk VLS magazine — Foster’s vertical launch system magazine installed during subsequent upgrade incorporated construction materials of the upgrade period

VA Claims for USS Paul F. Foster Veterans

VA presumptive service connection under 38 CFR § 3.309(d) covers asbestos exposure from Navy destroyer service. Officers and crew members who served aboard USS Paul F. Foster and have since been diagnosed with mesothelioma, asbestosis, or asbestos-related lung cancer may qualify for VA disability benefits.

Navy Ratings Most Exposed to Asbestos Aboard Paul F. Foster

The U.S. Department of Veterans Affairs and the public asbestos litigation record document that the following Navy ratings worked routinely in spaces where ACM was installed, maintained, ripped out, and replaced:

VA Presumptive Benefits — No Filing Deadline

The U.S. Department of Veterans Affairs recognizes mesothelioma, asbestos-related lung cancer, asbestosis, and pleural disease as conditions presumed to be service-connected for Navy veterans with documented asbestos exposure under 38 CFR § 3.309(d). No statute of limitations applies to VA disability compensation claims.

Available benefits may include monthly disability compensation, Dependency & Indemnity Compensation (DIC) for surviving spouses, priority VA healthcare enrollment, and Special Monthly Compensation for severe cases. Parallel claims against the asbestos bankruptcy trust funds established by the manufacturers of these products do not reduce VA compensation.

How to file a VA disability claim: VA claims are filed directly with the U.S. Department of Veterans Affairs — not with a law firm. Start at VA.gov › Hazardous Materials Exposure, call 1‑800‑827‑1000, or get free help filing from a Veterans Service Organization: DAV, VFW, or American Legion.

VA Claims Guide on This Site › Compare: VA vs. Civil Lawsuit

Source notes: equipment-manifest entries (where shown) are sourced from public-record BUSHIPS (Bureau of Ships) documentation, NARA archives, and the public asbestos litigation record. Manufacturer attributions link to documented asbestos-product histories on AsbestosIndex.com where available. Nothing on this page constitutes medical or legal advice.